The Paraburdoo MEM Office Upgrades cover the electrical engineering, design, documentation and consulting for upgrades to several buildings at Rio Tinto’s Paraburdoo mine site — the LV Workshop, Training and PSI Room, Crib Room, and the MEM Workshop ground and first-floor offices.
Aurum Engineering was engaged by Grounded Group to work closely with Rio Tinto, the architect (CADDS) and the wider project team to deliver a well-coordinated solution, reusing existing communications racks and the local fire panel where practical.




