The Fiona Stanley Hospital Multi-Storey Carpark is critical public infrastructure supporting one of Western Australia’s largest and most complex health precincts. Aurum Engineering was engaged to provide Level 2 Independent Verification (IV) across the electrical building services package, ensuring the design met all compliance, safety and performance obligations before construction commenced.
Scope of verification
- Power distribution — switchboards, submains, metering arrangements and redundancy provisions.
- Lighting and lighting control — compliance with AS/NZS 1680, energy efficiency requirements and operational suitability for a high-use public facility.
- Emergency and exit lighting — coverage, circuiting, battery autonomy and compliance with AS/NZS 2293.
- Fire and life safety interfaces — integration with fire detection, EWIS, smoke control and essential services switching.
- Security systems — boom gates, ticketing infrastructure, CCTV, communications pathways and associated low-voltage systems.




